Most single-suction-point installs in a basement or slab home finish in one day. Crawl-space membranes and houses with two foundation types can take a second day. The independent verification test follows after the house returns to normal use.
More detail
The visible work is quick: core the slab, dig the suction pit, run the pipe, mount the fan, seal the entry points, label the system, mark the manometer. What stretches a job is almost always underneath or overhead. Tight Des Moines lobe till that will not let one suction point reach the far side of the slab means a second core. A fully finished lower level means the pipe route has to thread a closet or chase instead of crossing open joists. A crawl under the addition means membrane work on top of the basement system. Then comes the part unique to Iowa: scheduling the post-mitigation measurement with someone outside the installer's firm. Build a few days of calendar room for that handoff, especially near a closing date, and say so up front if a purchase contract is driving the schedule, because the whole sequence can be built backward from closing.